    Site Readiness Checklist
  • Prior to Intellihot arrival onsite for commissioning, the following items MUST be verified by customer and/or any subcontractors directly involved with the installation of Intellihot equiptment.  If an installation site fails to be completely ready for a factory start up visit, Intellihot can not guarantee the ability to commission it's own equiptment and maybe forced to schedule a subsequent visit at the customers expense.  

     

    This report must be submitted back to Intellihot, NO LATER than 14 days prior to requested commissioning date.  Failure to submit report with all components confirmed and in place, can result in delay of commissioning date.  Should intellihot arrive and find the site not ready, an additional revisit expense will be charged to the signing party below.

     

  • All utilities are in place and operational (Electric/Gas/Water)*
  • Unit is completely plumbed, this includes (Electric/Gas/Water) as per IOM and local plumbing codes*
  • Venting (flue) is in place per installation manual requirements and local plumbing code*
  • Wye strainer and check valves are in place per installation manual requirements*
  • Air is bled from the internal pump and the water lines, 100%*
  • T&P relief valve for unit has been installed per the installation manual requirements and local plumbing code*
  • If common vented setup, sweeping Tees are installed?
  • If multiple units installed, is there a dedicated gas regulator per unit installed?
  • Please take the requested pictures

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Format: (000) 000-0000.
  • Date
     / /
  • Image field 31
  • Should be Empty: